Project Number Project Title Stage Comments
NCHRP 18-03Silica Fume Concrete for Bridge DecksCompleted
NCHRP 18-04ADurability of "Early-Opening-to-Traffic" Portland Cement Concrete for Pavement Rehabilitation: Background and Plan for EvaluationCompleted
NCHRP 18-04BDurability of "Early-Opening-to-Traffic" Portland Cement Concrete for Pavement RehabilitationCompleted
NCHRP 18-05Relationship of Portland Cement Characteristics to Concrete DurabilityCompleted
NCHRP 18-06Service Life of Corrosion-Damaged Reinforced Concrete Bridge Superstructure ElementsCompleted
NCHRP 18-06AService Life of Corrosion-Damaged Reinforced Concrete Bridge Superstructure ElementsCompleted
NCHRP 18-07Prestress Losses in Pretensioned High-Strength Concrete Bridge GirdersCompleted
NCHRP 18-08Supplementary Cementitious Materials to Enhance Durability of Concrete Bridge DecksCompleted
NCHRP 18-08ASupplementary Cementitious Materials to Enhance Durability of Concrete Bridge DecksCompleted
NCHRP 18-09AGuidelines for Reducing Premature Deterioration of Hydraulic Cement Concrete Pavements: Background and Research PlanCompleted
NCHRP 18-10Procedures for Evaluating Air-Entraining Admixtures for Highway ConcreteCompleted
NCHRP 18-11Improved Specifications and Protocols for Acceptance Tests on Processing Additions in Cement ManufacturingCompleted
NCHRP 18-12Self-Consolidating Concrete for Precast, Prestressed Concrete Bridge ElementsCompleted
NCHRP 18-13Specifications and Protocols for Acceptance Tests of Fly Ash Used in Highway ConcreteCompleted
NCHRP 18-14Evaluation and Repair Procedures for Precast/Prestressed Concrete Girders with Longitudinal Cracking in the WebFinal
NCHRP 18-15High-Performance/High-Strength Lightweight Concrete for Bridge Girders and DecksCompleted
NCHRP 18-16Self-Consolidating Concrete for Cast-in-Place Bridge ComponentsCompleted
NCHRP 18-17Entrained Air Void System for Durable Highway ConcreteFinal
NCHRP 18-18Design and Construction of Deck Bulb Tee Girder Bridges with UHPC ConnectionsFinalPublished as NCHRP Research Report 999
NCHRP 18-19Rating Concrete Water Permeability Based on Resistivity MeasurementsCompleted
NCHRP 18-20AASHTO LRFD Design, Installation, and Standard Practice of Testing for Cured In-Place Pipe LinersCompletedThe remaining tasks have been transferred to a new project that is pending
NCHRP 18-20(01)AASHTO LRFD Design, Installation, and Standard Practice of Testing for Cured In-Place Pipe LinersAnticipatedAnticipated - Phase I and II were completed by Golder & Associates under the original award for NCHRP 18-20. Pending a new contract to complete the remaining phases.
NCHRP 18-21Utilization of Alternative Supplementary Cementitious Materials in Highway ApplicationsPendingContract pending at this time.
NCHRP 18-22Concrete Shrinkage Measurement and Cracking MitigationRFP