A PLAN FOR DEVELOPING HIGH SPEED, NONDESTRUCTIVE TESTING PROCEDURES FOR BOTH DESIGN EVALUATION AND CONSTRUCTION INSPECTION (R06)
The final report has been published as SHRP 2 Report S2-R06-RW. The findings of this project related to Nondestructive Testing and its recommendations for subsequent research work in this area are presented in this report.
|
Nondestructive testing (NDT) techniques that can produce rapid inspection of new construction would facilitate timely reopening of a highway after reconstruction. Adequate NDT techniques are also needed to ensure the quality of construction required for long-term performance.
|
Project R06 considered NDT needs for rapid renewal and generated 7 related projects (R06A-G). The NDToolbox includes all 7 NDT products and is available athttps://www.ndtoolbox.org/.
|