Project Number Project Title Stage Comments
SHRP 2 R01Encouraging Innovation in Locating and Characterizing Underground Utilities Completed
SHRP 2 R01(A)Technologies to Support Storage, Retrieval, and Utilization of 3-D Utility Location DataCompleted
SHRP 2 R01(B)Utility Locating Technology Development Utilizing Multi-Sensor Platforms and Innovation in Location of Deep Utility Pipes and TunnelsCompleted
SHRP 2 R01(C)Innovations in Location of Deep UtilitiesCompleted
SHRP 2 R02Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction andCompleted
SHRP 2 R03Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal EnvironmentsCompleted
SHRP 2 R04Innovative Bridge Designs for Rapid Renewal Completed
SHRP 2 R04(A)Innovative Bridge Designs for Rapid Renewal (Bridge Demonstration Project)Completed
SHRP 2 R05Modular Pavement TechnologyCompleted
SHRP 2 R06A Plan for Developing High Speed, Nondestructive Testing Procedures for both Design Evaluation and Construction Inspection Completed
SHRP 2 R06(A)Nondestructive Testing to Identify Concrete Bridge Deck DeteriorationCompleted
SHRP 2 R06(B)Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction MaterialsCompleted
SHRP 2 R06(C)Using Both Infrared and High-Speed Ground Penetrating Radar for Uniformity Measurements on New HMA LayersCompleted
SHRP 2 R06(D)Nondestructive Testing to Identify Delaminations between HMA Layers Completed
SHRP 2 R06(E)Real-Time Smoothness Measurements on Portland Cement Concrete Pavements During ConstructionCompleted
SHRP 2 R06(F)Development of Continuous Deflection DeviceCompleted
SHRP 2 R06(G)High-Speed Nondestructive Testing Methods for Mapping Voids, Debonding, Delaminations, Moisture, and Other Defects Behind or Within Tunnel LiningsCompleted
SHRP 2 R07Performance Specifications for Rapid RenewalCompleted
SHRP 2 R09Guide for the Process of Managing Risk on Rapid Renewal ContractsCompleted
SHRP 2 R10Project Management Strategies for Complex ProjectsCompleted
SHRP 2 R11Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal ProcessCompleted
SHRP 2 R15Strategies for Integrating Utility and Transportation Agency Priorities in Highway Renewal Projects Completed
SHRP 2 R15(B)Identification of Utility Conflicts and SolutionsCompleted
SHRP 2 R15(C)Pilot Testing of the Utility Conflict MatrixCompleted
SHRP 2 R16Railroad-DOT Institutional Mitigation StrategiesCompleted
SHRP 2 R16(A)Communicating Railroad-DOT Mitigation StrategiesCompleted
SHRP 2 R16(B)Tools for Communicating Railroad-DOT Mitigation StrategiesCompleted
SHRP 2 R19(A)Bridges for Service Life beyond 100 Years: Innovative Systems, Subsystems, and ComponentsCompleted
SHRP 2 R19(B)Bridges for Service Life Beyond 100 Years: Service Limit State DesignCompleted
SHRP 2 R21Composite Pavement SystemsCompleted
SHRP 2 R23Using Existing Pavement In Place and Achieving Long LifeCompleted
SHRP 2 R26Preservation Approaches for High-Traffic-Volume Roadways Completed
SHRP 2 R31Integrated Delivery of SHRP 2 Renewal Research ProjectsCompleted
SHRP 2 R55Renewal Implementation SupportCompleted