SHRP 2 R01 | Encouraging Innovation in Locating and Characterizing Underground Utilities | Completed | |
SHRP 2 R01(A) | Technologies to Support Storage, Retrieval, and Utilization of 3-D Utility Location Data | Completed | |
SHRP 2 R01(B) | Utility Locating Technology Development Utilizing Multi-Sensor Platforms and Innovation in Location of Deep Utility Pipes and Tunnels | Completed | |
SHRP 2 R01(C) | Innovations in Location of Deep Utilities | Completed | |
SHRP 2 R02 | Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction and | Completed | |
SHRP 2 R03 | Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal Environments | Completed | |
SHRP 2 R04 | Innovative Bridge Designs for Rapid Renewal | Completed | |
SHRP 2 R04(A) | Innovative Bridge Designs for Rapid Renewal (Bridge Demonstration Project) | Completed | |
SHRP 2 R05 | Modular Pavement Technology | Completed | |
SHRP 2 R06 | A Plan for Developing High Speed, Nondestructive Testing Procedures for both Design Evaluation and Construction Inspection | Completed | |
SHRP 2 R06(A) | Nondestructive Testing to Identify Concrete Bridge Deck Deterioration | Completed | |
SHRP 2 R06(B) | Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials | Completed | |
SHRP 2 R06(C) | Using Both Infrared and High-Speed Ground Penetrating Radar for Uniformity Measurements on New HMA Layers | Completed | |
SHRP 2 R06(D) | Nondestructive Testing to Identify Delaminations between HMA Layers | Completed | |
SHRP 2 R06(E) | Real-Time Smoothness Measurements on Portland Cement Concrete Pavements During Construction | Completed | |
SHRP 2 R06(F) | Development of Continuous Deflection Device | Completed | |
SHRP 2 R06(G) | High-Speed Nondestructive Testing Methods for Mapping Voids, Debonding, Delaminations, Moisture, and Other Defects Behind or Within Tunnel Linings | Completed | |
SHRP 2 R07 | Performance Specifications for Rapid Renewal | Completed | |
SHRP 2 R09 | Guide for the Process of Managing Risk on Rapid Renewal Contracts | Completed | |
SHRP 2 R10 | Project Management Strategies for Complex Projects | Completed | |
SHRP 2 R11 | Strategic Approaches at the Corridor and Network Level to Minimize Disruption from the Renewal Process | Completed | |
SHRP 2 R15 | Strategies for Integrating Utility and Transportation Agency Priorities in Highway Renewal Projects | Completed | |
SHRP 2 R15(B) | Identification of Utility Conflicts and Solutions | Completed | |
SHRP 2 R15(C) | Pilot Testing of the Utility Conflict Matrix | Completed | |
SHRP 2 R16 | Railroad-DOT Institutional Mitigation Strategies | Completed | |
SHRP 2 R16(A) | Communicating Railroad-DOT Mitigation Strategies | Completed | |
SHRP 2 R16(B) | Tools for Communicating Railroad-DOT Mitigation Strategies | Completed | |
SHRP 2 R19(A) | Bridges for Service Life beyond 100 Years: Innovative Systems, Subsystems, and Components | Completed | |
SHRP 2 R19(B) | Bridges for Service Life Beyond 100 Years: Service Limit State Design | Completed | |
SHRP 2 R21 | Composite Pavement Systems | Completed | |
SHRP 2 R23 | Using Existing Pavement In Place and Achieving Long Life | Completed | |
SHRP 2 R26 | Preservation Approaches for High-Traffic-Volume Roadways | Completed | |
SHRP 2 R31 | Integrated Delivery of SHRP 2 Renewal Research Projects | Completed | |
SHRP 2 R55 | Renewal Implementation Support | Completed | |