FY2023 NCHRP PROBLEM
STATEMENT TEMPLATE
Problem Number: 2023-D-15
Problem Title
Guidebook
for Developing Effective P3 Project Performance Metrics.
Background Information and Need For Research
NCHRP
Synthesis 51-19: P3 Performance Metrics identified a gap in the body of
knowledge regarding the implementation of transportation infrastructure public-private
partnerships (P3). A P3 is defined as a
contract between the public and private sectors for the delivery of a project
or service in which the private partner provides the majority of the necessary
financing. The synthesis found that no definitive guidance exists on how to
quantifying asset performance. The literature reviewed determined that an
effective metric is focused on outcomes rather than merely outputs. At the
theoretical level, this seems like a simple difference. However, in the world
of complex megaprojects, the sheer magnitude of the requirement to develop and
deploy metrics that cover everything from administrative procedures to
reasonable residual lives for a plethora of asset classes is daunting.
Therefore, practical guidance is needed to provide for differentiating between
an output and an outcome. The objective of this project is to sample successful
P3 projects and determine the types of metrics in use and their relative
effectiveness in quantifying asset performance.
The effort
would likely consist of sampling a variety of performance metrics for common
elements of a given asset, like pavements or incident response, from a variety
of P3 projects. The actual performance of each of these would then be measured
against the standards found in the concession agreement and the actual payment
adjustments to provide a measure of efficacy. Simultaneously, both the agency
and concessionaire would be surveyed to furnish perceptional data that could be
compared to the quantitative data to identify trends and potential disconnects
between actual and perceived effectiveness. In recent years, establishment of
the USDOT Build America Bureau and enabling legislation in many states have
facilitated implementation of P3 projects in the transportation sector.
However, the selection of P3 implementation, just like any other project
delivery methods is driven primarily by the goals and objectives of the DOT and
the specific project. DOTs are still faced with many challenges in aligning
these goals and objectives to the delivery methods of choice. In addition, once
a project delivery selection is made, monitoring project performance over the
length of the project, given this decision becomes vital for assessing and
improving future projects’ performance and delivery decisions.
Performance
metrics in P3 projects should address the public client’s overall strategic
plan and mission objectives, overall quality and performance of a given asset,
and possibly market-specific outcomes that indicate sustainable delivery
models. These performance metrics should
include key indicators that might include travel time reliability, safety,
overall project physical condition, as well as other project/contract elements.
Despite the importance of performance metrics, knowledge is relatively limited
about the most effective practices for selecting metrics, setting metrics
performance levels, and reasonable approaches to deductions and/or point
systems for failure of the Concessionaire to meet contract requirements, that ultimately
align with the DOT’s goals and objectives.
The
proposed research should address at a minimum the following questions:
• What are the different arrangements
of P3s used in the transportation industry? What are the key selection
parameters for each, in light of DOTs’ project goals and objectives?
• What are the key performance metrics
for P3 projects? How can they be measured? How effective are they?
• What are effective ways to tie
performance metrics to payment mechanisms (i.e. lane availability, route
performance, condition criteria, safety performance, unplanned events, etc.) to
the P3 contractor?
• If the P3 concessionaire does not
comply with performance standards, what actions (e.g., nonconformance reports,
penalty point notices, etc.) should be taken?
• If the P3 concessionaire maintains or
exceeds the level of performance specified for the majority of the contract
term, what incentives, if any, should be provided?
• What techniques have been used to
avoid and resolve disputes? Which have
been most effective and which have been less effective?
• What risk sharing approaches appear
to have best partnership outcomes?
Literature Search Summary
Gransberg,
D.D., DeWitt, S. and Touran A. (2020), P3 Performance Metrics, NCHRP Synthesis 51-19,
NAS.
Federal
Highway Administration (2009). “Public-private partnerships for highway
infrastructure: Capitalizing on international experience.” International
Technology Scanning Program.
Yuan, J.
F., Zeng, A. J. Y., Skibniewski, M. J., and Li, Q. M. (2009). “Selection of
performance objectives and key performance indicators in public-private
partnership projects to achieve value for money.” Constr. Manage. Econom.,
27(3), 253–270.
Yuan, J.,
Skibniewski, J., Li, Q., & Zheng, L. (2009). “Performance objectives
selection model in public-private partnership projects based on the perspective
of stakeholders.” Journal of Management in Engineering, 26(2), 89–104.
Research Objective
The
objective of this project is, thus, to develop a structured decision-making
model for DOTs on implementing an effective P3 project from inception to
operations, that is driven by the DOT goals and priorities, and assessed by
performance metrics pertinent to the selected P3 arrangement (from availability
payments, to sharing revenue, to full privatization, among others). The
decision-making model should take into consideration factors such as various P3
arrangements and financing options and resources and time constraints. Based on
the results of this study, a guidebook will then be developed to provide
information on practices that may assist in selecting various P3 arrangements,
as well as assessing the project using key performance metrics that align with
the project goals and objectives.
The
purpose of this project is to (1) investigate the different P3s arrangements
and risk sharing models used in the transportation industry, and link them to
DOTs’ project goals and objectives, (2) examine performance metrics for P3
projects used by DOTs, as well as other countries in the delivery of
transportation infrastructure; (2) document lessons learned; and (3) make
implementation recommendations that will improve U.S. policy and practice. This project will produce an empirical guide
based on effective practices regarding selection of performance measures for P3
projects, and provide guidance on selecting different P3
arrangements/structures given DOT goals and objectives, as well as effective
practices for implementing performance measures.
Specific
tasks of the research to accomplish the main objective include:
• Task 1 – Conduct comprehensive
literature review of studies related to P3 arrangements.
• Task 2 – Benchmark the
state-of-the-market and practice, across the various transportation agencies,
related to P3 selection choices and establishing project performance metrics.
• Task 3 – Prepare a research work plan
• Task 4 – Conduct representative
detailed case studies
• Task 5 - Execute the research work
plan and prepare an interim research report
• Task 6 - Publish the guidebook
performance metrics
• Task 7 - Prepare a final research
report detailing the complete results of the research.
Urgency And Potential Benefits
During
the development and operation phases of a project, performance metrics will be
compared with established performance objectives that serve as a baseline, to
determine how successful organizations (and the Private sector partner) have
been in attaining project objectives. The payoff of this research will be
improved decision making for DOT on various P3 arrangements, as well as
administration and control of P3 projects, which ultimately will result in
higher public satisfaction. Another
benefit is relating to support of P3 Market aspects. The guidelines will become available to
transportation agencies through the traditional NCHRP distribution processes.
Implementation Considerations
Outcome
will benefit current and future Transportation P3 investments.
Recommended Research Funding and Research
Period
The
estimated project budget is $500,000 and the period is 24 - 36 months.
Problem Statement Author(S): For each author,
provide their name, affiliation, email address and phone.
Darryl
D.VanMeter, P.E., Georgia DOT and several member volunteers of AKC20, Project
Delivery Methods
dvanmeter@dot.ga.gov
404-694-3511
Potential Panel Members: For each panel
member, provide their name, affiliation, email address and phone.
AKC20,
Project Delivery Methods
Darryl D.
VanMeter, Georgia DOT, dvanmeter@dot.ga.gov
Person Submitting The Problem Statement: Name, affiliation,
email address and phone.
Darryl D.
VanMeter, P.E., GDOT Asst. P3 Director and State Alternative Delivery
Administrator
Georgia
DOT