Project Number Project Title Stage Comments
NCHRP Synthesis 20-05/Topic 56-01Specialized Training and Knowledge Transfer Practices for Employee SafetyNew
NCHRP Synthesis 20-05/Topic 56-02Design, Production, and Construction of High RAP Asphalt MixturesNew
NCHRP Synthesis 20-05/Topic 56-03Current Practices in Pedestrian Safety Enhancements by State DOTsNew
NCHRP Synthesis 20-05/Topic 56-05Traffic Analysis Practices for Non-Motorized Modes (Vulnerable Road Users)New
NCHRP Synthesis 20-05/Topic 56-06Practices for Transitioning to Digital Project Delivery New
NCHRP Synthesis 20-05/Topic 56-07Practices for Incorporating Risk into Bridge Management PlansNew
NCHRP Synthesis 20-05/Topic 56-08Using Cathodic Protection to Mitigate Corrosion of Reinforced Concrete and Structural Steel Components of Highway Structures New
NCHRP Synthesis 20-05/Topic 56-09Staffing Models for Transportation Systems Management and Operations (TSMO)New
NCHRP Synthesis 20-05/Topic 56-10Practices to Reduce Serious Injuries and Fatalities (SIFs) with Department of Transportation EmployeesNew
NCHRP Synthesis 20-05/Topic 56-12Practices on Management, Operation, and Maintenance of Automated Traffic Signal Performances MeasuresNew
NCHRP Synthesis 20-05/Topic 56-13Budgetary Practices for State Stormwater Permit Compliance Programs New
NCHRP Synthesis 20-05/Topic 56-14State DOT Training Programs to Comply with NPDES Stormwater Permit RequirementsNew
NCHRP Synthesis 20-05/Topic 56-15Practices for Designing, Installing, Maintaining, Replacing, and Successively Using Complementary Bridge Deck Protection SystemsNew
NCHRP Synthesis 20-05/Topic 56-16Data Collection and Management to Expedite Pothole RepairsNew
NCHRP Synthesis 20-05/Topic 56-17Testing and Modeling Practices for Implementing a Pavement Friction Management ProgramNew
NCHRP Synthesis 20-05/Topic 56-18Practices for Personal Protective Equipment New
NCHRP Synthesis 20-05/Topic 56-19Practices on Coordination of HSIP and Highway Safety Office ActivitiesNew
NCHRP Synthesis 20-05/Topic 56-20Pavement Design and Evaluation of Low Volume Roads with Heavy LoadsNew
NCHRP Synthesis 20-05/Topic 56-21Practices Related to Design and Construction ContingencyNew
NCHRP Synthesis 20-05/Topic 56-22State DOT Practices for Recruiting and Retaining Engineering, Planning, and Management EmployeesNew