Session 706
Full-Depth Bridge Deck Replacement
Wednesday, January 12, 2005, 4:30 PM - 6:00 PM, Marriott
M Myint Lwin, Federal Highway Administration, presiding
Sponsored by:
Construction of Bridges and Structures Committee (AFH40)
Design and Construction of a Full-Width, Full-Depth Precast Concrete Deck Slab on Steel Girder Bridge (05-0727)**
Alex Thomas Harrison, CH2M Hill
Norman David LeBlanc, Totten Sims Hubicki AssociatesPrecast Bridge Deck Solutions for Rapid Rehabilitation of Truss Bridge (05-0242)**
Munindra Talukdar, Washington State Department of TransportationFull-Depth Deck Replacement with Lightweight Deck Panels (P05-0951)
Mark Kaczinski, DS Brown Company
Robert A. Bettigole, Consultant, FranceRapid Deck Replacement Using Fiber-Reinforced Polymer Composite Systems (P05-0952)
Jerome S. O'Connor, University of Buffalo
Subject Areas:
Accelerated Design and Construction
Construction
Structures