HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP Synthesis 20-05/Topic 33-10 [Final (Synthesis)]

Steel Bridge Erection Practices
[ NCHRP 20-05 (Synthesis of Information Related to Highway Practices) ]

  Project Data
Funds: 25000
Staff Responsibility: Jon M. Williams
Effective Date: 2/27/2002
Completion Date: 5/12/2005
Fiscal Year: 2001

National Cooperative Highway Research Program
NCHRP Project 20-5

Synthesis of Highway Practice 345
Steel Bridge Erection Practices

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 345: Steel Bridge Erection Practices examines steel bridge erection practices for I-girder, tub-girder, and box-girder bridges; particularly curved, skewed, and staged structures.  The report focuses on the impact of design and analysis practices on erection; methods used to predict erection deflections as a function of bridge type and complexity; shop-assembly practices and alternate methods of ensuring properly assembled geometry; stability issues; field connection practices; examples of structures in which erection practices have caused problems; owner requirements for erection procedures, implementation of requirements, and the impact of procedures on the quality of erection; and current and proposed research.  This topic is published at https://www.trb.org/news/blurb_detail.asp?id=5052


To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=54