HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP Synthesis 20-05/Topic 44-15 [Final (Synthesis)]

State Bridge Load Posting Processes and Practices
[ NCHRP 20-05 (Synthesis of Information Related to Highway Practices) ]

  Project Data
Funds: $40,000
Authorization to Begin Work: 5/4/2012 -- estimated
Staff Responsibility: Jon M. Williams
Research Agency: University of Colorado - Boulder
Principal Investigator: George Hearn
Effective Date: 7/1/2012
Completion Date: 4/11/2014
Fiscal Year: 2012

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 453: State Bridge Load Posting Processes and Practices is a synthesis of the practices of U.S. state governments in restricting weights of vehicles that can cross highway bridges and culverts to levels below legal loads. Bridges and culverts restricted for vehicle weights are called load posted structures. The load posting practices of bridge owners include the identification of structures to post for load, the evaluation of safe load capacities of these structures, and the implementation of restrictions on vehicle weights at structures.

To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=3367