HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP 25-40 [Completed]

Long-Term Performance and Life-Cycle Costs of Stormwater Best Management Practices

  Project Data
Funds: $550,000
Research Agency: RBF Consulting
Principal Investigator: Mr. Scott Taylor
Effective Date: 4/23/2012
Completion Date: 6/23/2014
Comments: Final report published as NCHRP Report 792.

 

 

 
The objective of this research was to develop guidelines for the selection and maintenance of highway-related stormwater Best Management Practices based on long-term performance and life-cycle costs.  
 
For each broad category of BMP type, while providing flexibility to address the local context (e.g., topography, geology, climate, urban versus rural, soil type, site constraints), the final products provide decision-making guidance on the following: 
  • Defining long-term performance and selecting appropriate performance measures;  
  • Predicting long-term performance, service life, and maintenance costs based on the best current information and practice;
  • Determining appropriate inspection schedules and procedures;
  • Determining appropriate maintenance schedules and procedures;
  • Incorporating long-term performance and life-cycle costs into the BMP selection process;
  • Ensuring that funding, staffing, and training requirements are understood and considered by all relevant functional areas within the transportation agency for the selection, installation, inspection, and maintenance of BMPs; and 
  • Identifying life-cycle data collection and analysis protocols to facilitate future evaluation of long-term BMP performance.  
 
The final report has been published as NCHRP Report 792

 


 

To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=3192