HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP 12-29 [Completed]

Design of Simple-Span Precast Prestressed Bridge Girders Made Continuous

  Project Data
Funds: $241,993
Research Agency: Construction Technology Laboratories/PCA
Principal Investigator: R. G. Oesterle
Effective Date: 8/26/1985
Completion Date: 5/31/1988

The objectives of this research were to investigate the behavior of precast prestressed bridge girders made continuous by connections using cast-in-place slabs and diaphragms at the piers, and to develop design procedures and guide specifications that can be used to compute elastic, inelastic, time-dependent, and ultimate moments commensurate with the degree of continuity developed by the connections at piers.

The research was completed and the results are reported in NCHRP Report 322, "Design of Simple-Span Precast Prestressed Bridge Girders Made Continuous." The report includes recommendations for positive and negative moment steel at the continuity connection, along with recommendations for changes to the design requirements in the AASHTO Standard Specifications for Highway Bridges. The report also includes the description of a simplified computer program that was developed to calculate the time-dependent forces and moments in the girders and at the connections.


To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=312