HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP 12-88 [Final]

Synthesis on System Performance of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions

  Project Data
Funds: $84,000
Research Agency: BergerABAM
Effective Date: 8/16/2010
Completion Date: 3/16/2011

NCHRP Report 698 identifies promising details to be used for connections of bridge members in accelerated bridge construction in medium to high seismic regions and gives recommendations for further research. Existing connection details were gathered from sources from state Departments of Transportation, industry, and academia and were systematically categorized, characterized, and evaluated for their performance in terms of readiness for use, construction risk, durability, and seismic performance. The material in this report will be of immediate interest to bridge engineers.


To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=2966