HOME MyTRB CONTACT US DIRECTORY E-NEWSLETTER FOLLOW US RSS


The National Academies

NCHRP Synthesis 20-05/Topic 15-10 [Final (Synthesis)]

Prefabricated Bridge Elements and Systems
[ NCHRP 20-05 (Synthesis of Information Related to Highway Practices) ]

  Project Data

This synthesis will be of interest to bridge designers, maintenance and construction personnel, and others concerned with the design, maintenance, and rehabilitation of bridges. Information is presented on the use of prefabricated elements that can be used to construct new bridges or rehabilitate old ones. The report for this topic can be purchased at https://www.trb.org/news/blurb_detail.asp?id=3438

To create a link to this page, use this URL: http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=1824